
Transport – Multiple Layer Flow Applied System
The Long Rock depot project forms part of the larger GWR enhancement scheme to improve the…
Our client manufactures industrial components, ranging from fluid couplings to sprag clutches, designed and manufactured to high standards from its facility in Cardiff. As part of general site maintenance, TPS360 were contracted to prepare and protect steel roof steels, cranes and columns.
Preparation
In advance of the new coatings being applied, all primed surfaces were cleaned and then lightly sanded where necessary.
Primary Coating
Alkyd Glos
Application
Roller applied at >150 micron per coat
Other services included
Be first to see all the updates from MTDCNC
Our newsletters frequency varies dependant on content
All the latest deals from the industry feature on our newsletters